Above Ground Tank Inspection Service
The Steel Tank Institute (SPI) developed the standard inspection protocol, SP001, governing inspections for shop-built and field-erected ASTs containing up to 50,000 gallons of fuel. Knowledge of EPA requirements plus other federal, state, and local regulations impacting fuel storage are critical. CD & Power can help you meet these unique regulatory requirements by:
- Performing inspections per SP001 protocol and provide inspection report
- Training all technicians who perform inspections at your site
Risks of Noncompliance
Organizations that fail to have regular inspections performed are at risk of citations by the fire authority, leaks and the associated penalties, costly repairs, and downtime.
In order to comply with EPA SPCC (Spill Prevention, Control and Countermeasure) rules, a facility must regularly test liquid level sensing devices to ensure proper operation (40 CFR 112.8(c)(8)(v))